Back to projects
Civil and hydraulic engineering
Design and EIA of a double tunnel on the A23 motorway with computer simulation
Design and EIA of the environmental effects of a double tunnel on the A23 motorway in the eastern Alps, with computer simulation.
- Client
- Autostrade S.p.A., SPEA S.p.A.
- Location
- A23 motorway, Italy46.41 N 13.31 E
- Areas
- Civil and hydraulic engineering
Fig. 1 A23 motorway, Italy. Regional boundaries dashed.
Contact
Write to us
info@tommasitommasi.comFor technical enquiries use the email address; for offers and formal communications use the PEC certified email.
Contact