Other assignments for the same client
- Experimental lagoon plant for polluted runoff from a motorway toll gate
- Third lane on 14 km of the A4 motorway
- EIA and executive environmental design for 8+4 km of the A28 (lots 28 and 29) with computerised monitoring
- Surface water mitigation at crossings under the A28 and roads SP41 and SP43
- Real-time monitoring network along the A28 motorway, lot 28
- Lidar survey of about 200 km of motorways with automatic feature extraction
- Real-time system for surface water quality along motorway ditches
- New A4 exit at Latisana: mitigation, noise barriers and afforestation
- A28 motorway, lot 28: definitive and executive geometric design, noise barriers and construction supervision support
- Real-time monitoring network along the A4 motorway near Latisana
- A4 motorway junction at Latisana: preliminary and executive geometric design
- A28 motorway, lot 29: definitive and executive geometric design and noise barriers
- Real-time monitoring network along the A28 motorway, lot 29
- A4 motorway junction at Meolo: preliminary and executive geometric design
- EIA and preliminary design of the third lane of the A4 motorway between Venice and Palmanova
- Road platform drainage for about 20 km of the Villesse-Gorizia motorway
- Quarry of about one million cubic metres of gravel for road construction
- Excavation and clean-up plans for a quarry along lot 29 of the A28
- Processing of a Lidar survey of 200 km of motorways in north-east Italy
- A23 motorway at Campoformido: preliminary design of a noise barrier
- A28/SP41 junction: preliminary design of noise barriers
- Definitive and executive design of noise barriers on the A4 motorway at Marcon
- Air quality modelling of the A28 motorway around Conegliano for the EIA
- Air and water quality monitoring network for Autovie Venete in the Gorizia area